EV charging that fits your vehicles and your power

Fleet depots, workplaces and public sites across Chennai and India — Syncsine sizes the connection, picks the AC/DC mix and commissions charging that matches how your vehicles actually operate.

Where EV projects usually stall

The connection is the bottleneck

Chargers are the easy part. Sanctioned load, transformer and cabling decide whether the project is smooth — or stuck in a load-enhancement queue.

Wrong mix, weak payback

Idle DC bays and queues at AC points mean the business case never closes. Sizing to real dwell times and mileage is what makes utilisation work.

Systems that have to stay up

Chargers must talk to load management and billing, and keep running through heat, dust and an uneven supply — especially on Indian industrial campuses.

EV charger installation

What Syncsine delivers on site

An EV site is an electrical project first. We size the connection, choose the charger mix, design load management and tie it into your operations and billing — so you are not left with hardware that the grid cannot feed.

Study and design

Measurements, calculations and drawings you can take to tender or straight to order.

Equipment supply

Tier-1 components chosen for your duty — not a catalogue push.

System integration

Controls, protection and communications made to work as one system.

Installation supervision

Syncsine engineers on site alongside your electrical contractor.

Testing and commissioning

Acceptance tests, training and a clean handover pack.

Operation and maintenance

Scheduled service, thermography and remote monitoring where useful.

Sites we design for

Fleet depots and logistics hubs

Corporate and IT parks

Residential societies

Hotels and hospitality

Retail, malls and fuel stations

Bus depots and transit

Highway charging plazas

Industrial campuses

From brief to live chargers

1. Listen & measure

We review bills, single-line diagrams and, where needed, run a short measurement campaign on site or remotely.

2. Design & propose

Clear sizing, equipment selection, protection scheme and a costed proposal with expected payback.

3. Build & commission

Supply, installation supervision, testing and documented handover with your contractor.

4. Stay with you

Monitoring options, preventive maintenance and AMC so the system keeps earning its keep.

Estimate connection size before you commit

Enter vehicles, daily kilometres and dwell time; get charger count, peak demand and transformer kVA — every formula shown.

Common questions

How much power does an EV charging depot need?

Start from energy: vehicles × daily km × kWh/km. Divide by the usable charging window and efficiency for average power, then apply diversity for the peak. A 20-van depot at 150 km/day needs about 900 kWh/day and, with an 8-hour window, roughly 150–400 kVA depending on charger mix. Use the EV Charger Sizing calculator for your fleet.

AC or DC — which should we install?

AC (7.4–22 kW) suits vehicles that stay six hours or more; DC (30–240 kW) suits short dwell or high daily mileage. Most depots mix both: AC overnight, a few DC units for midday top-ups and contingency.

Can we add chargers without a new transformer?

Often yes. Dynamic load management caps combined draw to your sanctioned load, and a battery buffer can absorb short peaks. We check those options before recommending a connection upgrade — they are usually cheaper and faster.

Do you handle DISCOM approvals and metering?

We prepare the load-enhancement application, single-line diagram, earthing and metering scheme, and coordinate with the utility and your contractor through inspection and energisation.

Which standards apply to EV chargers in India?

IS 17017 for conductive charging, CEA safety rules, ARAI or BIS certification of the chargers, IEC 61851 for interoperability, and OCPP 1.6J or 2.0.1 for the charging backend.